Project Name: Equipment Purchase, Installation, and Debugging Project for the Sludge Treatment Engineering of the First and Second Sewage Treatment Plants in Suzhou District, which is part of the 2017 Shantytown Renovation and Infrastructure Construction Project - Water Supply and Drainage Pipeline Laying and Renovation Project (Second Bid Section) in Suzhou District.
Project Overview: The total scale of the sludge treatment and disposal project is 120 tons per day, with a recent construction scale of 80 tons per day. Six sets of electro-osmotic sludge drying treatment equipment are used to reduce the moisture content of the sludge from 80% to less than 60% through electro-osmotic drying treatment, and then the sludge is landfilled.
The project started at the end of 2021 and completed final acceptance in September 2022.
项目现场
电渗透污泥干化处置惩罚装备